Skip to main content

AI Summary of Article 7 Group pre-emptive recovery plans

Version status: Entered into force | Document consolidation status: No known changes
Version date: 28 January 2025 - onwards
Version 2 of 2

Article 7 Group pre-emptive recovery plans

1. Member States shall ensure that the group supervisor has the power to require that the ultimate parent undertaking of a group draw up and submit to the group supervisor a group pre-emptive recovery plan.

Group pre-emptive recovery plans shall consist of a pre-emptive recovery plan for the group headed by the ultimate parent undertaking. The group pre-emptive recovery plan shall identify remedial actions that may be required to be implemented at the level of that ultimate parent undertaking and at the level of its individual subsidiary undertakings to restore their financial position where that position has significantly deteriorated.

The group supervisor shall impose the requirement referred to in the first subparagraph on the basis of the criteria referred to in Article 5(2) or (3), as applicable.